全国服务热线
15552522412?
联系我们
亿电竞平台app

联系人:田经理

联系电话:15552522412?

网址:

地址:济南市天桥区北园大街248号二楼西侧间

如何测试下水道是否已经通畅呢?

来源:  发布时间:2021-02-16 21:08:37

污水渠堵塞后,我们需要找管道公司清理工作,所以工作完成后,我们需要测试下水道,所以你知道如何测试下水道是否畅通吗?下面是详细介绍:
After the sewer is blocked, we need to find the pipeline company to clean up, so after the work is finished, we need to test the sewer, so do you know how to test whether the sewer is unblocked? Here is a detailed introduction:
建议采用上述防堵塞措施防止排水管堵塞,但为保证工程质量,为用户服务,室内排水管道在竣工验收前,必须按照标准进行检测。
It is suggested to adopt the above anti clogging measures to prevent the drainage pipe from clogging, but in order to ensure the project quality and serve the users, the indoor drainage pipe must be tested according to the standard before the completion acceptance.
根据规范的要求,室内排水管水流强度试验应从上到下或在浴缸、洗脸盆、水槽等水设备中进行,然后进行水流试验,不漏水,或将2至3张卫生纸扔进厕所,以确定纸张是否被迅速吸进污水管,并顺利排放到室外管道井中。
According to the requirements of the specification, the water flow intensity test of indoor drainage pipe should be carried out from top to bottom or in the bathtub, washbasin, sink and other water equipment, and then the water flow test should be carried out to ensure no leakage, or 2 to 3 pieces of toilet paper should be thrown into the toilet to determine whether the paper is quickly sucked into the sewage pipe and smoothly discharged into the outdoor pipe well.
                        亿电竞平台app
根据管道系统的层层数,供水排水分配点应逐个打开,各排水管道和冒口应通畅,界面不漏水,并根据管道系统各层的配水点同时打开1个≤3配水点,各排水管道和冒口应畅通无阻地流动。
According to the number of layers of the pipeline system, the distribution points of water supply and drainage should be opened one by one, the drainage pipes and risers should be unobstructed, and the interface should be watertight. According to the distribution points of each layer of the pipeline system, one ≤ 3 water distribution point should be opened at the same time, and the drainage pipes and risers should flow smoothly.
根据每个管道系统的配水点总数,1≤3配水点通常位于高水位,每个排水口和立管应顺利排放。"对于地面排水,应使用橡胶管进行排水,排水口应顺利排放。经过六层以上建筑物的引水试验,所有的污水冒口和雨水冒口都必须通过球进行。实验制皮球的直径约为排水管垂直管直径的3≤4。将球从排水立管顶部投入,以通过相应的坑井,否则应识别和处理堵塞地址。
According to the total number of water distribution points of each pipeline system, 1 ≤ 3 water distribution points are usually located at high water level, and each outlet and riser shall be discharged smoothly. "For ground drainage, rubber pipes shall be used for drainage, and the drainage outlet shall be discharged smoothly. After the water diversion test of buildings with more than six floors, all the sewage risers and rainwater risers must pass through the ball. The diameter of the ball is about 3 ≤ 4 of the vertical diameter of the drainage pipe. Put the ball from the top of the drainage riser to pass through the corresponding pit, otherwise the blockage location should be identified and handled.
XML 地图 | Sitemap 地图